Driller Craig Armishaw, of Washingtons Drilling and
Exploration, operates a modified Minerals Coring Rig on the
Goodwin-1 well site near Ohai. The well is the first in
L&M Petroleum's search for coal-seam gas in its Western
Southland Basin permit. Photo by Robert Landreth
The first well drilled by L&M Petroleum, in its
search for coal seam gas near Ohai is expected to be completed
next week after problems with the drilling equipment put a halt
to the job.
LMP chief executive John Bay said the well at Goodwin-1 was
the first of three the company would drill "back to back", in
order to gather core samples for analysis.
Mr Bay said the company was also gathering new seismic data
near the western end of the Ohai coalfield to determine where
subsequent wells would be drilled.
On Saturday, the small crew at Goodwin-1 had reached a depth
of 200m with a faltering rig and were still drilling through
mudstone.
Site manager and geologist Nicola Cummack said the well was
expected to reach a depth of 250m, by which time the coring
bit would have passed through two coal seams.
Ms Cummack said once the coal core samples are obtained they
would have to be removed quickly and placed in sealed
canisters to determine the gas content accurately.
The cores would be stored to measure the coal's "desorption
levels" or total gas content, which could take up to six
months to be totally "desorbed".
Ms Cummack said it was important for the company to support
the local community and over past operations the LMP crews
had stayed at accomodation in Nightcaps and enjoyed the
hospitality of Southlanders.
"I love coming to work down here," she said.
"Having the support of your local community is important. We
try and support the locals."
Ms Cummack said she had heard stories from "old boys" who
were forced to leave the mines when the gas build-up had
become a danger.
She said in the past coal gas was generally only seen as a
hazard and its potential as an energy source was never
tapped.
"It's never been turned into a commercial resource," she
said.
"[Today] we're chasing it, we want it."
Mr Bay said "realistically" it would take 3 to 4 years before
the company started producing gas commercially.
He said the extraction of gas did not involve any invasive
mining techniques as, in "very layman terms", the gas was
released from the coal in a similar way to the gas which is
released from a bottle of Coca-Cola when the cap was removed.
The wells would draw the gas off like "straws", which meant
each would only have a small footprint, he said.
"They'd fit into your lounge."
Once the well at Goodwin-1 has been completed, wells would be
drilled at Wairaki-1 and Mt Linton-1.
The listed company expects to find around 300 petajoules of
coal seam gas in its Western Southland Basin permit.
A name, residential address, and (preferably residential) telephone number is required from readers who comment on ODT Online. These details will not be visible to site visitors.