The site of the former Port Chalmers railway station may be
used as a station again next month. Photo by Jane Dawber.
Mosgiel commuters will not have the option of taking the
train into Dunedin on Walk to Work day next month because of
their lack of support last time.
Only 27 passengers rode the Mosgiel train last year compared
with 200 who used the Waitati train.
The Waitati train is scheduled to run again, leaving the
Waitati railway station early on March 10 and returning later
in the day.
Dunedin City Council safe and sustainable travel co-ordinator
Charlotte Flaherty said Mosgiel people had been less
enthusiastic than those living in the Waitati area who were
"really actively interested in getting on the train and using
the train as transport".
"I think it has to come from the community . . . You can't
put one on and then say: `Now use it!"'
The $4000 cost of running the train would be met by the
Dunedin City Council but Ms Flaherty hoped $3000 in fares
could be recovered.
The train from Waitati could carry bicycles.
A new Port Chalmers group called Transition Town is hoping
the Waitati train can stop at the site of what was formerly
known as the Port Chalmers Upper railway station, off Ajax
St.
The station was once the place where Port Chalmers people
caught main-line trains, such as the "midnight express" that
passed through on its way to Christchurch most nights just
before midnight.
It is believed the station has not been used for passengers
since the 88-seat Drewry railcars stopped running in the late
1970s.
The few buildings there - a shed, a ticket office and a
toilet - have since been removed and the area has become
overgrown.
Transition Town member Jonathon Clearwater said the group had
discussed the use of the site with Ontrack and Taieri Gorge
Railway, which operates the commuter train, and there were
plans to tidy up the area.
One of its advantages would be eliminating a time-consuming
shunting operation to get the Waitati train into Port
Chalmers' lower station.
Use of the upper station would mean the Waitati to Dunedin
trip should take about an hour.
It was not clear yesterday whether Ontrack had approved the
use of the site.
Taieri Gorge operations manager Grant Craig said the March 10
timetable had yet to be confirmed, but it was planned to
depart from Waitati at 7.20am and from Dunedin, on the return
trip, at 5.40pm.
mark.price@odt.co.nz
Bookmark/Search this post with:
A name, residential address, and (preferably residential) telephone number is required from readers who comment on ODT Online. These details will not be visible to site visitors.