He visited the Forsyth Barr Stadium in Dunedin today, while the Irish prepare to play the All Blacks in New Plymouth on Saturday, and was impressed with what he saw.
"It is very innovative and very different. Most covered stadiums have astro-turf. This is the first time I have ever seen or heard of a closed stadium that has natural grass."
The $198 million stadium is on track to be completed by August 1, 2011, in time for the Rugby World Cup.
The main roof truss, that will support the structure, went up in May with the arch trusses due to be erected soon. The stadium will be covered with a specially designed see-through roof when it is completed.